Early September 2026 at XIOL: Timber Formwork and Reinforcement

Photos from September 1 show timber decking above XIOL’s walls, supporting posts below and steel reinforcement being assembled.

construction
Concrete walls, blockwork and timber supports at XIOL on September 1.

At the start of September, work continued above the concrete and block walls. Timber posts supported plywood decking, while crews worked on the formwork and steel reinforcement around it.

These September 1 views show the work from below and above: timber supports inside the structure, and decking with horizontal steel cages and upright reinforcement overhead.

Explore XIOL’s apartment layouts or get in touch to learn more about the project.

On site

The crew working around the timber formwork above the walls.
The crew working around the timber formwork above the walls.
Timber posts supporting the plywood formwork overhead.
Timber posts supporting the plywood formwork overhead.
Plywood decking with steel reinforcement along its edges.
Plywood decking with steel reinforcement along its edges.
Horizontal reinforcement cages above the concrete and block walls.
Horizontal reinforcement cages above the concrete and block walls.