· Updated September 6, 2026
Early September 2026 at XIOL: Timber Formwork and Reinforcement
Photos from September 1 show timber decking above XIOL’s walls, supporting posts below and steel reinforcement being assembled.
construction
At the start of September, work continued above the concrete and block walls. Timber posts supported plywood decking, while crews worked on the formwork and steel reinforcement around it.
These September 1 views show the work from below and above: timber supports inside the structure, and decking with horizontal steel cages and upright reinforcement overhead.
Explore XIOL’s apartment layouts or get in touch to learn more about the project.