Early September 2026 at XIOL: Timber Formwork and Reinforcement
Photos from September 1 show timber decking above XIOL’s walls, supporting posts below and steel reinforcement being assembled.
Journal
Insights on investment, construction progress, and the XIOL lifestyle.
Photos from September 1 show timber decking above XIOL’s walls, supporting posts below and steel reinforcement being assembled.
See XIOL’s August building progress, including exposed concrete walls, blockwork and timber supports throughout the site.
July’s site gallery follows wall reinforcement, timber formwork and another concrete pour at the XIOL development.
Follow June’s foundation work at XIOL, with photographs of steel grids, concrete placement and the site later in the month.
Presale is open, the sales office is on the corner, and foundation work is underway at XIOL in Playa del Carmen.
May construction photos from XIOL in Playa del Carmen show foundation trenches, assembled steel reinforcement and timber forms.
A quick look at the rooftop pool, jacuzzi, sun deck, and social areas designed for residents at XIOL.
Learn how XIOL's innovative lock-off apartment design allows owners to rent two separate units from one property, maximizing income potential.
Explore the philosophy and Mayan heritage that inspired XIOL's name and design, creating a living space that honors tradition while embracing modern luxury.
A look inside the XIOL construction site in February, from excavation work to steel reinforcement being prepared.
Location, amenities, and investment highlights for XIOL in Playa del Carmen’s Zazil-Ha neighborhood.