· Updated September 6, 2026
July 2026 at XIOL: Concrete and Wall Formwork
July’s site gallery follows wall reinforcement, timber formwork and another concrete pour at the XIOL development.
construction
In July, work continued on the steel reinforcement and timber forms around the foundation. Tall reinforcement grids stood along the wall sections, with scaffolding alongside them.
Another concrete pour took place on July 24. In the days that followed, crews were fitting and bracing timber wall forms beside the poured surface.
Explore XIOL’s apartment layouts or get in touch to learn more about the project.