ES
· Updated September 6, 2026

July 2026 at XIOL: Concrete and Wall Formwork

July’s site gallery follows wall reinforcement, timber formwork and another concrete pour at the XIOL development.

construction
Workers fitting timber wall forms beside the poured concrete surface.

In July, work continued on the steel reinforcement and timber forms around the foundation. Tall reinforcement grids stood along the wall sections, with scaffolding alongside them.

Another concrete pour took place on July 24. In the days that followed, crews were fitting and bracing timber wall forms beside the poured surface.

Explore XIOL’s apartment layouts or get in touch to learn more about the project.

On site

Tall steel reinforcement grids beside the scaffolding.
Tall steel reinforcement grids beside the scaffolding.
Reinforcement and timber forms before the July concrete pour.
Reinforcement and timber forms before the July concrete pour.
The crew placing concrete through a pump hose on July 24.
The crew placing concrete through a pump hose on July 24.
The newly poured concrete surface later that day.
The newly poured concrete surface later that day.