June 2026 at XIOL: Reinforcement and Concrete Work

Follow June’s foundation work at XIOL, with photographs of steel grids, concrete placement and the site later in the month.

construction
Newly poured concrete with vertical reinforcement extending above it.

Following May’s foundation work, June brought larger steel grids and more vertical reinforcement. The crew worked across the foundation sections, tying the steel into place.

On June 18, concrete was pumped into a reinforced section of the foundation. Later views show the poured surface with steel extending above it, while work continued elsewhere on the site.

Explore XIOL’s apartment layouts or get in touch to learn more about the project.

On site

Steel reinforcement arranged across a foundation section.
Steel reinforcement arranged across a foundation section.
A worker assembling vertical steel reinforcement.
A worker assembling vertical steel reinforcement.
Concrete being placed through a pump hose on June 18.
Concrete being placed through a pump hose on June 18.
A wider view of the concrete and exposed reinforcement later in June.
A wider view of the concrete and exposed reinforcement later in June.